Microgrid & Resilience Planning
Decide what must keep running before you decide how to power it.
A microgrid is not a solar array with a battery attached. It is an intentionally designed configuration of generation, storage and controls that can separate from the grid and keep defined critical loads running, and that definition begins with a question only the owner can answer: what must keep running, for how long, and what interruption is acceptable. Green Summit helps owners and institutions evaluate microgrids and resilience options around critical services, outage assumptions and operating priorities, coordinating feasibility and technical planning with the parties responsible for electrical design, safety and utility approval. We are a licensed engineering firm founded in 2014, and we keep a feasibility concept clearly distinct from a completed protection, islanding or emergency-power design.
- Licensed engineering firm
- Founded 2014
- Engineered substantiation, not estimates
- Audit-ready documentation
Who this is for
Developers, owners, housing providers, public institutions, Tribal Nations, program administrators and technology companies responsible for facilities that must stay in service when the grid does not.
What we do
- Build the critical-load and continuity inventory. We work with you to list the services that must continue, the loads behind them and the order in which they matter.
- Compare the combinations. We evaluate PV, storage, generators and controls together against outage duration and operating needs, rather than one technology at a time.
- Document the concept. We record the concept requirements, implementation dependencies, interconnection questions and testing expectations the design team will inherit.
Our process
- Identify essential operations and acceptable interruption limits. The resilience objective is written down before any equipment is discussed.
- Compare technical concepts and lifecycle assumptions. Each concept is judged on what it keeps running, for how long and at what cost over its life.
- Develop the basis for qualified design, procurement and verification. The concept becomes a brief the responsible engineers can design from.
Benefits
- A more explicit resilience objective, agreed before it is priced.
- Visibility of the controls and infrastructure dependencies behind that objective.
- An organized technical basis for the investment decision, and for the design brief that follows it.
Why Green Summit
Our team connects building systems, energy analysis and procurement support, so the resilience concept is grounded in how the facility actually operates. Green Summit is a licensed engineering firm founded in 2014 and a consulting partner delivering end-to-end compliance solutions in building performance; our findings are engineered substantiation, not estimates, and the record is built to be audit-ready from day one.
We distinguish a feasibility concept from a completed protection, islanding or emergency-power design, and we say which one you are holding. The authorized design and installation parties carry the electrical design, safety and utility approvals; our work gives them a clear, documented starting point.
Frequently asked questions
What is a microgrid?
A microgrid is a deliberately designed group of generation, storage and controls that can operate connected to the utility grid or, when the grid fails, separate from it and keep defined critical loads running. That ability to island depends on the configuration and the controls, not on the presence of solar or a battery, and it has to be designed, approved and tested before anyone relies on it.
Is a solar array automatically a microgrid?
No. Microgrid operation requires an intentionally designed configuration and controls. On-site generation alone does not establish islanding capability or continuity of critical loads, and many arrays shut down when the grid does.
Can you plan for community resilience hubs?
Yes. We help define the facility loads, the service priorities, the outage scenarios and the concept options together with the community and the responsible technical team, so the hub is planned around the services people will actually need during an outage. Cooling, refrigeration, communications and lighting each carry a different load, and the inventory makes those choices explicit before the concept is priced.
What outage duration should we use?
That is an owner and risk-planning decision, informed by the services the facility provides and the local context. We compare scenarios rather than assuming one duration fits every facility, so you can see what each additional hour of continuity costs and which loads it is worth carrying for that long.
Who handles utility and electrical approvals?
The authorized design and installation parties work with the utility and the jurisdiction. Green Summit supports coordination and technical documentation within the defined scope, and we never present a concept as an approved design.
How can performance be demonstrated?
The project should define acceptance tests, control sequences, operating procedures and monitoring before commissioning. Testing of emergency or islanded functions requires qualified personnel and an approved plan, and we help define those expectations at the concept stage so they are not improvised at the end.
Let's start with what must keep running.
Tell us the facility and its location, the services that cannot stop, how long you need them to continue when the grid is down and what on-site equipment, if any, is already in place.
Related solutions
- Distributed Energy Consulting
- Battery Storage & Load-Management Advisory
- Building Systems Commissioning & Functional Verification
- Measurement & Verification
- Strategic Consulting
Or call 321-273-2200 · inquiry@greensummit.com